|
See you next year for the 27th Projects Competition 2011.
Posted: 17 Sep
2010
Click
HERE to view the winners of the Projects Day Grand Finals 2010.
Posted: 16 Sep
2010
Five groups have been selected to move on to the Projects Day
Grand Finals which will be held on 16 Sep (Thu) from 2.00 pm. More
information regarding the rehearsals and details will be
disseminated on the EMB by the OS-PDGF in due time. Click
HERE to see
the 5 Grand Finalists.
Posted: 6 Sep
2010
This is to inform that the Patrons for the Projects Day Grand
Finals, to be held on 16 Sep (Thu), are Mr William Yiu and Mr Lim
Puay Koon.
Posted: 1 Sep
2010
The Grand Finals Selection Round will be held on 2 Sep (Thu) from
2.00 pm onwards. Information has been disseminated on the EMB. Click
HERE to see the nominees.
Posted: 26 Aug
2010 COMPLETED
Results for the Project Finals round have been released. Please
refer to the EMB for more information.
Posted: 18 Aug
2010 COMPLETED
After web-reports have been uploaded, please check for quality
control. Some bits of advice are available
HERE.
Posted: 31 Jul
2010 COMPLETED
Instructions for the Oral Presentation on 13 Aug (Fri) for
Project Finalists have been disseminated on the EMB. The same
information is available
HERE.
Posted: 25 Jul
2010 COMPLETED
Instructions for Project Finalists to upload their web-reports
have been disseminated on the EMB. The same information is available
HERE.
Posted: 21 Jul
2010 COMPLETED
For groups that qualify for the Finals, please be informed that
the next judging round will be on 13 Aug (Fri) afternoon. More
information will be disseminated soon.
Posted: 14 Jul
2010 COMPLETED
Projects Semi-finals results have been released. Please refer to
the EMB for details.
Posted: 13 Jul
2010 COMPLETED
Details for Semi-finals judging on 7 Jul (Wed) have been released
on the EMB.
Posted: 2 Jul
2010 COMPLETED
Please be informed that Semi-finals judging is scheduled on 7 Jul
(Wed) during curriculum time. More details will be released soon.
Posted: 27 Jun
2010 COMPLETED
All groups are to upload their project synopsis onto the project
server by 2 Jul (Fri), 5.00 pm. Details have been made available on
the EMB dated 23 Jun (Wed).
Posted: 25 Jun
2010 COMPLETED
Results for Prelim1 (held on 7 Apr, Wed) were posted on the EMB.
Groups that have cleared Prelim1 and groups going for Prelim2, more information
HERE.
Posted: 12 Apr
2010 COMPLETED
Preliminary Round judging will be
carried out on 7 April (Wed) during curriculum time. Information has
been made available on the EMB. Click
HERE to view the venues.
Posted: 14 Mar 2010 1 Apr
2010
COMPLETED
The materials used for the Projects briefing-cum-workshop
conducted on 9 Mar (Tue) from 10.00 am to 11.30 am are available.
Click
HERE to view it.
Posted: 12 Mar 2010
COMPLETED
Projects Competition registration has closed on 9 Mar (Tue). The
next phase is to get ready for the Preliminary Round judging.
Posted: 10 Mar 2010
COMPLETED
Projects Competition
briefing-cum-workshop by the respective Category Managers will be
carried out on 9 Mar (Tue) from 2.00 pm to 4.00 pm after the
Sabbaticals activities. Details are available on the EMB. Click
HERE to view the locations used for the briefing.
Posted: 4 Mar 2010
COMPLETED
Gentle reminder - The closing date for Projects Competition registration
for Sec 2, 3, 4 is 5 Mar (Fri) 5.00 pm, for Sec 1 is 9 Mar
(Tue) 5.00 pm.
Posted: 3 Mar 2010
COMPLETED
Projects Competition registration
is now opened from 1 Feb (Mon). More information is available on the
EMB.
Posted: 1 Feb 2010
COMPLETED
Click on the image to view the briefing
slides presented during the level assemblies.
Posted: 28 Jan 2010
COMPLETED
To be eligible to take part in
the Projects Competition, pupils must first accept the Terms and
Conditions as laid out in the Ethics Agreement. It is now open from
18 Jan (Mon) till 29 Jan (Fri, 3.00 pm). Look under Registration for
the link.
Posted: 9 Jan 2010, 18 Jan 2010
COMPLETED
Projects Competition briefing will be carried out
during the respective level assemblies as follows:
Sec 1 = 18 Jan (Mon)
Sec 2 = 19 Jan (Tue)
Sec 3 = 20 Jan (Wed)
Sec 4 = 21 Jan (Thu)
Posted: 8 Jan 2010, 17 Jan 2010
COMPLETED
|